1.Profile drawing:
(1) Up layer:
(2)down layer:
achine Detailed Parameters:
2. The Chart of Process Flow
3. Packing & Delivery
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 80$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
5. Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment
(1) Up layer:
(2)down layer:
No | Specification of the material | |
1 |
Suitable Material | Colored Steel plate, Galvanized steel |
2 |
Width of the raw material | 1250mm |
3 | Thickness | 0.3mm-0.7mm |
achine Detailed Parameters:
1 | Machine structure | Guide pillar structure |
2 | Total power | Motor power-7.5kw Hydraulic power-5.5kw |
3 | Roller stations | Up layer: about 11 stations Down layer: about 18 stations |
4 | Productivity | Up layer: 2-4m/min (excluding the cutting) Down payer: 0-15m/min (excluding the cutting) |
5 | Drive system | By chain |
6 | Diameter of shaft | ¢70mm solid shaft |
7 |
Voltage | 380V 50Hz 3phases (Customized) |
8 |
Container need | 1x 40GP + 1x 20GP containers |
2. The Chart of Process Flow
3. Packing & Delivery
- Deliver time: take goods after receive deposit 80 days
- Packing: suitable of ocean transportation
- Warranty: 1 year warranty from date of shipment
- Guarantee:
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 80$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
5. Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment